The bathroom is an area with unique conditions: high humidity, temperature differences. That’s why making repairs in the bathroom, you should definitely plan the whole working process, to think about the sequence of measures to be achieved. Within the following guide, you will learn the way to begin the repair in the restroom and what types of work ought to be carried out together with your own hands. Step-by-step directions for bathroom repair

Phase 1: Establishing a strategy and deciding upon a layout solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, originating from the can of unexpected circumstances. As an instance, in the event of an pipe burst, flooding with neighbors.
  • Planned, which is either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs in the bathroom is to ascertain the plan, interior. Think through the last detail, what will be the space, select a colour. Pastel colors are traditional, in addition to a blend of blue and blue, or peach with beige.

Begin repairs in the toilet is to determine the design, interior design. Think in detail, what will be the room, select a colour. Pastel colours are deemed traditional, in addition to a blend of colours.

Next point is that the selection of facing material. Generally, finishing at the toilet is performed with vinyl, porcelain tiles, mosaicand vinyl panels. Check the plumbing, if it has to be mended. If needed, pick a suitable alternative. Proceed to the measuring work: measure all sides, calculate the area of the area. Based on these information, we indicate the location of these plumbing fittings.

Step 2: the selection of sanitary fixtures and material for finishing.

It is crucial to recognize that the purchase price of sanitary ware precedes the planning stage, rather than vice versa. This usually means that first we create a design project, make a plan, and then go to the shop. The following point – you need to specify how big your favorite plumbing fixtures and examine the program, whether it fits.

It is important to recognize that the purchase of plumbing fixtures is completed by a planning period, rather than vice versa. This means that first we create a new design project, make a plan, and then go to the store. Another one

As for stuff for finishing, it’s preferable to get them instantly for the whole repair cycle, so that then you won’t be distracted if something has been missing. Remember about preparing the necessary tools.

Step 3: dismantling plumbing and tiling.

Once all the preliminary work is completed, proceed to the Start of the work process:

  • Remove the sink and bathtub from the room, even though they won’t be replaced with new ones. This manner, you may keep them clean and undamaged.
  • Remove the old vsyakuhnya.ru tile, cleaning after it all surfaces: ceiling, walls, flooring.
  • Remove paint from the walls, even if they were formerly painted, since the glue alternative or a new layer of paint will not adhere to the surface.

Measure 4: replacement of communications: pipes, electric wiring.

Quite frequently in an older house, you ought to carefully inspect and replace not only the pipes that are in the toilet itself, but in addition the major riser, and sometimes the interfloor pipes. Why is it worth doing this? Old pipes anytime can give a leak, and then the new repair is going to be emptied, it will call for extra investment to eliminate defects.